ELS, the lead architect on the community pool project, shared a video of the preferred design concept for the aquatic center at the December 14 pool workshop. A recap of the workshop is forthcoming, according to Clarence Mamuyac, the firm’s president.
New pool concept floated at Dec. 14 meeting
|
![](https://piedmontexedra.com/wp-content/uploads/2021/12/Piedmont-Aquatics-Aerial-Rendering-WITH-4FT-SIGNAGE.jpg)
ELS
Aquatics Center aerial rendering